Building

The Academy recognizes the significance of making facility arrangements and the associated obstacles. With that in mind, the Academy has contracted with Gateway Project Development, LLC (High Mark Schools) to acquire land and construct the school building. Among other things, the building will include:

  • Administrative Offices
  • Parent Preparation Area
  • Library/Media Room
  • Teacher Preparation Rooms
  • Appropriate Lab Rooms
  • Classrooms
  • Storage
  • Gymnasium
  • Performance Stage
  • Teaching Kitchen



Building Elevation 


Upon occupancy of the building, Gateway Academy intends to issue tax-exempt bonds to pay for the acquisition of the building from Gateway Project Development LLC. By owning the building, Gateway Academy will save on property taxes and lease increases.

The Academy will have a maximum capacity of 675 students K - 8. The Utah building code for public school buildings suggests there be 74 square feet per student. Anticipating a capacity of 675 students and based on 74 square feet per student, our building should be at least 49,950 square feet. Our contract is for a building of 52,000 square feet, designed specifically to enhance our educational philosophy.

Our elementary building will have one multi-use gymnasium. Please reference the Library section of the site for additional details on our planned library facilities. We have referenced the Americans with Disabilities Act (ADA) to assure that the facility will meet all requirements set forth therein. Parking will accommodate each member of the school's staff and any visitors. We will follow all ADA requirements for the number of handicapped parking spaces.

There will be areas designated on the property for fields, outdoor play, and physical education, including separations based on the grade levels of the students.

Facility First Floor

Facility First Floor

Facility Second Floor

Facility Second Floor

Construction Photos

Pictures below taken June 25th, 2008

Groundbreaking


September 19, 2007, 3:30 pm
September 19, 2007, 4:00 pm

Meeting Location: 
Gateway Preparatory Academy

Description: 

The Groundbreaking for our facility will be on 100 E. Thoroughbred Way, 1/2 block from Minersville Highway, about 1.1 miles from I-15 at 3:30 pm.

Parents, future students, other community members, and community officials are all invited to attend.

Groundbreaking InvitationGroundbreaking Invitation

facility

GLAD TO SEE THE BUILDING IS COMING ALONG .

Syndicate content